State: WA
Date: January 2020
Overview:
Our client required a robust and weatherproof solution for their mining operations in Western Australia. The challenge was to deliver custom-built racks within a tight 4-week timeframe to meet their operational deadlines.
Solution Provided:
PSS designed and manufactured 8 custom 18RU 800×800 IP66 racks, each equipped with a 600W air-conditioner to withstand harsh mining conditions. The units were built locally in Australia, ensuring quick turnaround and high-quality craftsmanship.
Outcome:
All racks were completed and dispatched directly to the mines within the specified lead time, meeting the client’s strict deadline. Detailed drawings provided during the design phase ensured seamless communication and precise execution, resulting in a solution tailored perfectly to the rugged demands of the mining industry.
Drawing below shows the rack design provided to the customer.